Page 74 - Industrial Ventilation Design Guidebook
P. 74

BIBLIOGRAPHY                                                               39

                        that may require changing (or removal or replacement) such as
                        filters.
                      • Design and dimension the ductwork and pipelines.
                      The tools for this subtask include:
                      • Duct design and dimensioning programs and diagrams
                      » Computer-aided design (CAD) solutions (drawing tools)



         3.13.2 Subtask 2: Operation
                      Design of the adjustment and control system.
                      The too/5 for this subtask include:

                      • Simulation programs
                      • Manufacturers' recommendations and prefabricated systems



         3.13.3 Subtask 3: Special Issues
                      • Design thermal insulation for ductwork and equipment.
                      • Design to prevent condensation risks.
                      • Design fire protection:
                        * Insulation
                        * Fire dampers
                        * Fire gas blowers
                      • Design sound and vibration damping.
                      The tools for this subtask include:
                      • Regulations
                      • Standards
                      • Manufacturers' guidelines


         3.13.4 Subtask 4: Commissioning Plan
                      • Specify the responsibility of each trade, system installer, or equipment
                        supplier.
                      • Plan the construction schedules and priorities.
                      • Specify the documentation requirements and format, such as checklists
                        for recording inspections, startup, and functional performance tests.
                      • Develop the format and program for training operating and
                        maintenance personnel.

                      The tools for this subtask include the standards.


         BIBLIOGRAPHY

                  Bach, H. et al. Gezielte Beliiftung der Arbeitsbereiche in Produktionshallen zum Abbau der
                      Schadstoffbelastung. Forschungsbericht HLK-1-92, 2nd ed., Verein der Forderer der Fors-
                      chung im Bereich Heizung, Liiftung, Klimatechnik, Stuttgart, September 1993.