3.13.2 Subtask 2: Operation
Design of the adjustment and control system.
The too/5 for this subtask include:
• Simulation programs
• Manufacturers' recommendations and prefabricated systems
3.13.3 Subtask 3: Special Issues
• Design thermal insulation for ductwork and equipment.
• Design to prevent condensation risks.
• Design fire protection:
* Insulation
* Fire dampers
* Fire gas blowers
• Design sound and vibration damping.
The tools for this subtask include:
• Regulations
• Standards
• Manufacturers' guidelines
3.13.4 Subtask 4: Commissioning Plan
• Specify the responsibility of each trade, system installer, or equipment
supplier.
• Plan the construction schedules and priorities.
• Specify the documentation requirements and format, such as checklists
for recording inspections, startup, and functional performance tests.
• Develop the format and program for training operating and
maintenance personnel.
The tools for this subtask include the standards.
BIBLIOGRAPHY
Bach, H. et al. Gezielte Beliiftung der Arbeitsbereiche in Produktionshallen zum Abbau der
Schadstoffbelastung. Forschungsbericht HLK-1-92, 2nd ed., Verein der Forderer der Fors-
chung im Bereich Heizung, Liiftung, Klimatechnik, Stuttgart, September 1993.