Page 121 - Machinery Component Maintenance
P. 121
104 Machinery Component Maintenance and Repair
Figure 3-20. Method of repairing cracks which develop between concrete pours. Note the
reinforcing steel crossing the crack at a location directly below the load-bearing area.
Pump Baseplate Installation and Epoxy
Grouting*
The goal of this section is to present a proven method of pump base-
plate installation using epoxy grout with zero voids. While this method is
not the only way to achieve a 100 percent void-free grout job, it has been
designed to shorten pump installation and alignment time by employing a
“one pour” grout procedure.
* Source: Perry C. Monroe, Monroe Technical Services, Houston, TX 77062.