Page 130 - Machinery Component Maintenance
P. 130

Machinery Foundations and  Grouting   113
































        Figure 3-28.  Always check the underside of the baseplates. Notice the center compart-
        ment is blocked by cross braces and would receive no grout.



        machinist’s level on the additional border around the pump and driver
        may not be the preferred method of leveling, it will work.



                            New Concrete Preparation
         Freshly poured concrete must be allowed to cure before epoxy grout is
        applied. As mentioned, even the small amount of  moisture from green
        concrete will ruin the epoxy grout/concrete bond. It is good practice to
        run an ASTM-157-80 Concrete Shrinkage Test to determine when the
        shrinkage drops to a minimum. This will indicate the end of the chemical
        reaction of the cement and water, which causes the concrete to cure. If no
        shrinkage test is run, the following rules of thumb for cure time can be
        used:
          Standard concrete (five-bag mix)                       28 days
         Hi-early concrete (six- to seven-bag mix)                7 days
         An additional test for moisture can be made by taping a 1-ft2 piece of
        plastic over the new concrete and allowing it to stay overnight. If there is
   125   126   127   128   129   130   131   132   133   134   135