Page 128 - Machinery Component Maintenance
P. 128

Machinery  Foundations und  Grouting   I I1

                   started early in the morning while the baseplate is level. Levels should be
                   verified after  the baseplate  temperature  has  stabilized  overnight.  Note
                   that the baseplate  should be  shielded from direct sunlight for 24 hours
                   prior to epoxy grouting and 48 hours after grouting.  Figure 3-27 illus-
                   trates the use of a cover to protect baseplate and foundation from both sun
                   and rain. If epoxy grouting is to be done in cold weather (below 45  OF).
                   baseplate and foundation must be shielded and heated.



                                          Baseplate Preparation
                     Now  that  the  baseplate  leveling  procedure  has  been  discussed,  the
                   baseplate requirements listed will be understood more clearly. These re-
                   quirements should be spelled out in the purchaser’s pump specification or
                   purchase  order.  Although  pump  manufacturers  often  provide  these  re-
                   quirements.  it  is  best to negotiate  and  review  them  prior  to placing  an
                   order.
                       All welding on the baseplate shall be completed and stress relieved
                       (if required) prior to machining the pump and driver mounting sur-
                       faces.
                       All  machined mounting surfaces shall be coplanar to 0.002 in.
                       All baseplate welds shall be continuous (no skip welding) and free of
                       cracks.
                       Underside  of  baseplate  shall  be  sandblasted  to  white  metal  and
                       coated  with  0.003-in.  wet  thickness  of  epoxy  coating  (not  epoxy
                       paint) as specified by  purchaser.
                       All cross bracing on the underside of the baseplate  shall have a 2.0
                       in. x 6.0-in.-wide opening to allow for grout flow.
                       Vent  holes  (0.5-in.  diameter)  shall  be  provided  for  each  bulkhead
                       compartment  at  all  corners,  high  points,  and  perimeter  edges  of
                       bulkhead. Perimeter vent holes in baseplate shall be on 18-in. centers
                       minimum. Any angle iron or “C” channels added for stiffeners will
                       require vent holes on both sides.
                       Radius all sharp corners on baseplate flanges, minimum  I .O-in.  ra-
                       dius.
                       Provide  Vx  in. minimum shim adjustment under driver feet for mc-
                       chanical alignment.
                       Provide eight alignment positioning  screws for the driver.
                       Machined mounting surfaces shall extend  I .O  in. beyond pump and
                       driver mounting feet on all sides.
                       Drill and tap two holes on the baseplate flanges, one on each side of
                       the anchor bolt  holes.  for  V2-in.  diameter (minimum) jack/leveling
                       screws.
   123   124   125   126   127   128   129   130   131   132   133