Page 21 - Mathematical Models and Algorithms for Power System Optimization
P. 21
Daily Economic Dispatch Optimization With Pumped Storage Plant 11
Total Install (MW) 740 1494 1200 860 995 7890 13,179
Install (MW) 1200 1200
P power
Install (MW) 669 60 195 924
grid H Purchase
power Install T (MW) 825 1200 800 800 6690 10,315
provincial Total Unit 5 19 4 6 21 27 82
a
in Unit
units P unit 4 4
generating Unit H Equivalent 14 9 23
of Unit 5 4 6 12 23 50
composition T
Basic Total Plant 5 6 1 2 5 8 27
2.1 Plant 1 1
Table P plant
Plant 4 3 7 pump.
H Equivalent P:
Plant 2 1 2 2 7 14 hydro; H:
T thermal;
Area Purchase East South West North Middle Total T: Note: