Page 549 - Offshore Electrical Engineering Manual
P. 549

536    Index




                         Process drives and starting requirements  Protection principle, 305, 307–308
                           applications, 124                Protection relays, 359, 365–371
                           cooling and ingress protection, 124  electrical checks on electronic and induction disc
                           diesel–electric fire pumps, 128–130  relays, 366–368
                           direct current drilling motors, 126–127  electrical tests
                           downhole pumps, 131                 on attracted armature relays, 369
                           fire pump diesel engine starting    on thermal relays, 369–371
                              requirements, 130              mechanical checks on induction disc and
                           gas compressors, 126                 attracted armature relays, 366
                           MOL and water injection pumps, 131  Protective circuits and devices, 383
                           pole configuration, 123–124      Protective Relay Application Guide (PAG), 252
                           power swivels, 127               Protective relays, 360, 366
                           reciprocating pumps and compressors, 124–125  Proven in use, 448
                           seawater lift pumps, 127–128     Provision and Use of Work Equipment Regulations
                           speed, 122                           (PUWER), 418
                           starting, 121–122                PSM. See Plug setting multiple (PSM)
                           voltage levels, 121              PSR. See Pipeline Safety Regulations (PSR)
                         Process equipment, 165–166         Public address system (PA system), 112–113,
                         Process Knowledge System (PKS), 167    283–284
                         Process modules, 317               Public Address/General Alarm (PA/GA), 178
                         Process shutdown system, 167–168   Puffer stream, 90
                         Production casing, 458             Pull-out protection, 220
                         Production process essentials, 460–463. See also   Pulse width modulation drive, 119
                              Drilling essentials           PUWER. See Provision and Use of Work
                           artificial lift facilities, 463      Equipment Regulations (PUWER)
                           gas reinjection, 462             PVC. See Polyvinyl chloride (PVC)
                           hydrates, 460–462
                           oil, water and gas separation, 460  Q
                           oil storage and export, 462–463  QA system. See Quality assurance system
                           water injection, 462                 (QA system)
                         Production switchboards, 81        Qualitative analysis, 395
                         Project procedures, 183–184        Quality assurance system (QA system), 184–185
                         Projected demand, 55               Quality control system, 185
                         Propulsion redundancy, 330         Quantitative analysis, 395–398
                         Protection and control, commissioning  evaluation using event failure rates,
                           closing and tripping, 373            397–398, 397f
                           CTs, 362–365                      evaluation using event probabilities,
                           precommissioning, 359                395–397, 396f
                           protection relays, 365–371       Quill, 457
                           protection scheme commissioning, 359–360
                           types, 370                       R
                           VTs, 360–362                     R/X ratio of the circuit, 69
                         Protection and discrimination, 251  Racking gear, 339
                           coordination, 257, 258f, 261, 261f  Radar transmissions, ignition avoidance by,
                           CT saturation, 258–260               315–316
                           data requirements, 252–254       Radio
                           Earth fault relay setting, 257, 259f  beacon, 179
                           overcurrent discrimination flowchart, 255f  ignition avoidance by radio transmissions,
                           overcurrent protection, 252          315–316
                           overcurrent relay setting, 255–257  paging system, 177
                           relay setting of MV platform scheme, 251–252  Radiography with radioactive sources, 381
                           setting voltage controlled overcurrent relays,   Rappelling, 408–409
                              262–263                       Rationalisation of spares, 407
   544   545   546   547   548   549   550   551   552   553   554