Page 554 - Offshore Electrical Engineering Manual
P. 554

Index   541




                  Variable-frequency                 Water ingress probability, 8
                   converters, 273                   Water injection, 110, 462
                   inverters, 89–90                   pumps, 131
                  Variable-frequency drive (VFD), 120  Water separation, 460
                  Variable-speed drive (VSD), 120, 216–217, 273  Watertight door monitoring, 337
                  Varnish, 26                        Wave height, 3
                  Ventilation, 316–318               Waveform analysis, 349
                   and housing of vented batteries, 116  Weather and sea protection, 295–297
                   systems, 18                        glass fibre reinforced plastic, 297
                  Verification records, retention of, 430  grey cast iron, 296
                  Verification scheme, 415, 417       hot dipped galvanised steel, 296
                  Vertical/horizontal coordinate system (V–H   manganese bronze and gunmetal, 296
                      coordinate system), 158         polycarbonate, 296
                  Very-high-frequency (VHF), 9        stainless steel, 295
                  Vessel management system (VMS), 330  welded and cast structural steel, 296
                  Vessels in vicinity, 113           Weight and space limitations of offshore
                  VFD. See Variable-frequency drive (VFD)  installation, 407
                  V–H coordinate system. See Vertical/horizontal   Weight control, 297–299
                      coordinate system (V–H coordinate system)  Weight limitations, 3
                  VHF. See Very-high-frequency (VHF)  Welded steel, 296
                  Vibration, 299                     Welding sockets, 81
                   analysis, 349                     Well completion, 458–459
                  VMS. See Vessel management system (VMS)  Well Examination Scheme (WES), 413, 417
                  Voltage, 114                       Well intervention, 339
                   balance, 349                      Well perforation, 459
                   characteristics, 85               WES. See Well Examination Scheme (WES)
                   controlled overcurrent relay, 263  Wind farm, 343
                   factor, 240                       Wind speed and direction, 59
                   harmonics, 276                    Wind turbine installation, 339
                   levels, 101, 101t, 121, 121t      Wind turbine structure, tension leg platform as, 341
                   ratio test, 361                   Winding protection, 208–209
                   tolerances selection, 114, 114t   Wireline logging, 458
                   total harmonic distortion, 276    Wiring diagrams, 109, 194
                   voltage-controlled relays, 227–228  Work safety coordination, 349–350
                  Voltage transformers (VTs), 209, 349, 353, 359–362  Written Scheme, 415, 425f
                   insulation resistance, 360, 361t  Written Scheme of Examination & Test (WSET),
                   phasing check, 361                    287, 417
                   polarity check, 361, 362f          guidance on developing, 423–424
                   restoration, 362
                   voltage ratio test, 361           X
                  Voltmeters, 353                    X/R ratios, 240
                  VSD. See Variable-speed drive (VSD)
                  VTs. See Voltage transformers (VTs)  Z
                                                     Zener barriers, 291
                  W                                  Zinc, 295
                  Walkways, 163
                  Water hazards, 15. See also Hydrocarbon hazards
   549   550   551   552   553   554   555   556