Page 173 - Open-Hole Log Analysis and Formation Evaluation
P. 173

4030
       pay
                        The
                maps
              gas/oil
                    seismic
                      structure
           isopachs.
         structure,
                  sufficient
       above
                        gross
             or

       the
                                        also
                showing
                  wells,
           Figure
                        rock
                      cannot
         together
                    mapping,
                      be
               how
           8.7
                  have
             gas/water)
                          VOLUMES
       oil/water
         with
                                        assumed
                        volume
                    many
                 been
               many
         an
           shows
                      deduced
           a
               net
                                                                                                  AOS
             contact
       contact.
                                       the
                 drilled,
               feet
           cross
                        enclosed
         isopach
                      froma
                 it
                                       well
             exist.
               of
                 is
         map
                   uncertainties
                                     If  the
                     single
               pay
                                            stratigraphic
                        within
           section
             Such
                       a
                                     bed
                     log.
                                       deviation
                 usually
                                     is
               above
                   remain.
             maps
         contouring
           through
                     Even
               the
           an
             are
         the
                 possible
                     with
                 to
                                           the
         net
                     the
                   However,
               oil/water
             known
        feet
                     aid
                                           same

           oil-bearing
             as
        of
               (or
                 prepare
                   after
                                     is
                       hydrocarbon-bearing
                                           at
                     of


                                       Vp
                           i   RESERVOIR   Vip   negative   numbers.   appear  as  and   TVT  will   answers  for  TST  If  this   occurs,  the   the  top  side.   side  and  exit  from   the   and   the   bottom  the  bed  from   will,  in  fact,  enter   that  the  well   possible   it   highly   dipping,   bed.   crosses  the   change:as  the  well   do  not  and   azimuth  =   that  is  bed.  It   the  the  well   leaves  as  it  is   when   enters  the  bed   point
                 Vg
            and
      Ver
                       The
                 =
      =
                            =
            the
                                                                                             i    ah        A   RESERVE   ESTIMATION
                                             by
                                                     area
                                                   in
                           t
                 7
                            &
                              n
                                       3.


                      volume

            total
                                                              Well  Services.
                                  total
                                                          such
                                                        found
      Fb
                                                 either
                            Vy.
                                               volume
                                                          a
                 Gat
                                                   figure
                      of  a
                                       [A,  +
                                                 by
                                                                       T
                                                     contained
                                                          map
                                                   8.8.
                                                       using
            volume
                                  volume
                                               of  the
                                                          is
                                                       a
                                       Ang.
                 Ane),
                                                                      T
                                       +
            of  a
                                  of  a
                      trapezoid
                                                     within
                                       V
                 ‘
                                                 planimeter
                                                          drawn,
                                               frustum
                                       An
      t2AF2AT
            series
                                                 or
                                                                      T
                                                     each
                                                   The  volume
                                                         the
                                                       planimeter.
                                               of  a
                      section
                                  pyramid
                                                 by
                                                   is
                                  is
                                                         area
                                       Ant1)]
      FIA
                                                   then
                                                       A  plot
                                                     contour
                                  then
                                               pyramid
                      between
                                                     as
           of  trapezoids
                                                 numerical
                                                     a
                 “e
                                                                      T
                      two
                                  given
           is,
      +A)
                                  by
                                                   calculated
      +
                                               between
                                                       may  then  be
                                                   as
      ty
                                                         enclosed  within
                                                     function
                                                   an
                                               two
                      contours
                                                 integration.
           therefore
                                                     of
      dy,
                                                       made
                      is
                                                         each
                                                 -

                                                              :     Area   ™  T
                                                                      >
                      given
                                                     depth
                                               contours
                      by
                                              is
                                                       showing
                                                   integration
                                                     as
                                                         contour
   168   169   170   171   172   173   174   175   176   177   178