Page 174 - Open-Hole Log Analysis and Formation Evaluation
P. 174
160
1
1
If
1
1
1
1.
“1
1.
1
Il.
IN
‘
will
API:
The
where
Banks,
be
True
areas
“A
average
Muskat,
Bef
paper
helpful.
1967).
Bateman,
Bateman,
4,
in
R.
MMB
cubic
barrel
are
is
reprinted
R.
(Vip
hectare
APPENDIX
R.
Poston,.$.W.:
METHODS
Exhibition,
-acre-foot
acre-foot
RESERVE
B.:
+
Log Analyst
Technology
Schlumbeiger:
of the
in
Monitoring,”
Morris:
following
Vertical
M.,
13135,
the
8A:
M.:
Statistical
(Volumetrics),”
1981),
BIBLIOGRAPHY
meter.
hectare-meter
hectare-meter
and
two
Ver)
acre-feet.
“New
acres
ch.
SPE
Houston,
IHRDC,
=
=
=
=
=
Study
=
=
14.
“Numerical
average
“Reservoir
Thickness
= .
and
presented
Symposium,
Konen,
(March-April
of
Sept.
volume
conversions
at
and
paper
C.
ESTIMATION
Boston
“Cased-Hole
Thoughts
OF ANALYSIS AND
178.1
=-5.615
.2.471
E.:
5.615
8.107.
the
CONVERSION
35.31.
0.1233
43,560
1984.
Hobbs,
1979).
353,147
on
contour
Log
thickness.
Simulation
Recovery
of Dipping
11339,
(1984),
NM,
an
59th
cu
of
estimates:
Production
cuft
cuft
cuft
ch.
ft
The
“Finding
m-ha
acres
Beds
MMcf
Nov.
acre-ft
MMB”
3.
Old
FACTORS
Analysis
APPLICATION
Annual
between English
True
Cut
total
8-9,
presented
thicknesses
Efficiency,”
=
=
=.
.=
.=
=
Reservoir
OF
and
by
at
Topic:
Physical Principles of Oil Production,
in
and
:
1982.
Fundamentals”
the
volume
Technical
feet,
0.159
6.289
7,758
Bulletin
62,893
RESULTS
metric
Stratigraphic
THRDC,
Sandstone
D
Reservoir
159Mm’?
m?
10,000
1233.5
Directional
1982
Reservoir
/
then
(1980).
14.
barrel
m?
.28.32MMm?
m°
units
barrels
barrels
Boston
required is
=
Conference
Thickness
Models,”
Wells,”
=
volumes
the
may be
(1949;
The
and
SPE
Integration
and
(October
Production
Performance
-
161
8.
a.
c.
b.
a.
c.
b.
d.
or
Water
MT
Hence
TST
TVT
TVD
HCPV
Pressure
Mobility
Answers
QUESTION
RESERVE
QUESTION
“yp
QUESTION
Reserves
:
to
Oil-in-place
term
ratio
#8.1
#8.2
#8.3
Oil-in-place
saturation
term
Text
difference
term
=
term
ESTIMATION
—
=
=
3. 5 ft
1. 253
27,153
236
Questions
54.9
ft
204.38
179.16
49.99
197.68
40.8%
{(0.25
ft
ft
ft
X
[0.2
X
MMSTB
0.3570:1993
bbl/acre
(1
of the
recovered
-
0.826
X
(2000/750)°”!”?
0.5)/1.5]°°”
1.221
oil-in-place
X
will
0.35)/1.25]°"”
0.809
be
1.221
0.826
49,99
0.408
0.809