Page 26 - Orlicky's Material Requirements Planning
P. 26
CHAPTER 1 Overview 7
FIGURE 1-2
Wheelwright and Hayes product/process matrix.
Process Structure Product Structure Low Volume Low Volume Higher Volume Very High Volume
Process Life Product Life Unique (One Multiple Standardized Commodity
Cycle Stage Cycle Stage of a Kind) Products Product Product
Project
Jumbled Flow Job Shop
(Job Shop)
Disconnected Line Batch
Flow (Batch)
Connected Line Flow Assembly Line
(Assembly Line)
Continuous Flow Continuous
(Continuous)
FIGURE 1-3
Planning,
execution, and Master
control systems. Production
Schedule Planning
MRP System
Purchasing Scheduling
Shop Order
Execution Receiving Loading Control
Receiving Dispatching
Inspection
Shop Floor
Control
Stores