Page 422 - Pipeline Pigging Technology
P. 422

Pigging  through  YJiWngs



      kind permission to publish the pig testing  results.



        REFERENCES


      1. L.A.Decker,  1989.  Test Report for  lOin x  lOin x  lOin piggable wye  fitting
        design test,  HydroTech Project  1763H, January.
      2. LA.Decker, 1989.  Test Report for  lOin x  lOin x  lOin piggable wye fitting
        investigative  test,  HydroTech Project  1763H, March.
      3. L.A.Decker,  1989.  Test Report for  lOin x  lOin x  lOin piggable wye  fitting
        operational  test,  HydroTech Project  1763H, May.
      4. L.A.Decker,  1990.  Test Report for  lOin x  lOin x  lOin piggable wye fitting
         using gas (air), HydroTech Project  1978S,  March.
      5. LA.Decker  and  W.S.Tillinghast,  1990.  Development  of a  10-in  piggable
        pipeline  wye fitting for the Jolliet Project, Offshore  Technology  Confer-
        ence, Paper no.OTC64l5.
      6. A.Ghielmetti  and  T.B.Schmitz,  1989.  A case history: Agip  Barbara lateral
         pipeline installation, Offshore Technology Conference, Paper no.OTC6l01.
      7.  B.R.Oyen,  1985.  wye  connection  replaces  offshore  platform,  Pipe  Line
        Industry, January.
      8. W.S.Tillinghast,  1990. The deepwater pipeline system on Conoco's Jolliet
         Project, Offshore  Technology  Conference,  Paper no.OTC6403.





























                                       403
   417   418   419   420   421   422   423   424   425   426   427