Page 123 - Practical Well Planning and Drilling Manual
P. 123

Section 1 revised 11/00/bc  1/17/01  2:56 PM  Page 99








                                                                                  1.4.24
                                                                    Casing Design  [      ]



                       Table 1-1  Casing Design Criteria—Conductor

                                            Drilling Criteria         Production Criteria

                         Burst        Resist a pressure at the shoe of
                                      1 psi/ft with a gas gradient to
                                      surface (0.1 psi/ft inside). Maximum
                                      burst at surface; depth (ft) x 0.9 psi/ft.



                         Collapse     Resist a normal external pressure
                                      (0.465 psi/ft) with the conductor
                                      evacuated (0.1 psi/ft inside). Maximum
                                      collapse at shoe; depth (ft) x 0.365 psi.


                         Tension      Weight of conductor in air plus
                                      overpull allowance of 200,000 lbs.
                                      Safety factor 1.1.


                         Compression  Withstand loads of subsequent
                                      casings, completion, wellhead, and
                                      BOP. Use a safety factor of 1.0 with
                                      the tensile minimum yield strength.


                         Buckling     Long, freestanding conductor;
                                      commission full engineering
                                      buckling analysis.


                         Other        1.  Resist driving forces if driven.   Offshore; corrosion
                                        Check that the planned connections  protection in the
                                        are suitable for driving.       splash zone.
                                      2. Set deep enough to allow returns
                                        to the flowline, except on floating
                                        rig where the next section drilled
                                        with returns to seabed.