Page 130 - Practical Well Planning and Drilling Manual
P. 130

Section 1 revised 11/00/bc  1/17/01  2:56 PM  Page 106








                      [      ]
                       1.4.24    Well Design



                       Table 1-6  Casing Design Criteria—Production Liner continued

                                     Drilling Criteria            Production Criteria

                                3. Axial loads due to buoyant
                                  weight plus test pressure plus
                                  bending stress if deviated along
                                  liner length.
                                  Safety factor 1.5.

                                4. Triaxial analysis incorporating
                                  temperature correction for yield
                                  strengths.

                                  Safety factor 1.25.











































                                                     106
   125   126   127   128   129   130   131   132   133   134   135