Page 145 - Practical Well Planning and Drilling Manual
P. 145

Section 2 revised 11/00/bc  1/17/01  12:04 PM  Page 121









                                       [      ]


                                           Section 2:



















                                           Well Programming







                                The first stage in drilling a well is to
                                design what the well needs to look like
                                when it is completed, which was cov-
                                ered in Section 1, “Well Design.” This
                                section discusses how to write a drilling
                                program, which defines the methods
                                necessary to ensure that the well design
                                and objectives will be met as safely and
                                cost effectively as possible. Section 3,
                                “Practical Wellsite Operations and
                                Reporting,” covers practical wellsite-
                                related operations; however, much of
                                this section is also directly relevant to
                                the rig. Cross-references between the
                                two sections are used where appropriate.
   140   141   142   143   144   145   146   147   148   149   150