                      [     ]   Practical Wellsite Operations
                       3.4.4



                       running list shown in Figure 3-6. If using premium connections, the
                       make-up torque can also be noted on the tally. This tally is easily made
                       up on the rig computer using a spreadsheet, which also makes any
                       amendments quick, accurate, and easy. Pit gain calculations can be
                       made automatically by formulae in the cells.










































                       Fig. 3-6  Example of Casing Running List Tally



                           Copies of the tally should be given to the driller, deck crew, crane
                       driver, and anyone else who needs one. The driller should mark off the
                       joints as they are run in the hole, checking the numbers against the
                       tally as they are run. If joints have to be laid down these can be marked
                       and the tally amended with spare joints.