                                                                                   3.5.6
                                                                       Cementing  [     ]


                       4. Check out the recirculating mixer for function in advance. In par-
                           ticular, ensure that the agitator and recirculating centrifuges are all
                           working to give maximum mixing energy in the tank.
                       5. Take samples from the sample point near the bottom of the tank. If
                           one is not fitted and there is nowhere else to take a sample from
                           near the bottom, discuss with the cement contractor about fitting
                           one. Put at least one sample in the oven and check thickening time
                           at temperature.

                           After the job.

                       1. Fill out the cement job report as soon as possible to record all
                           details. In particular, make any recommendations you and/or the
                           cementer feel would be advantageous for changes to future pro-
                           grams, procedures, or the drilling manual with full justifications.
                           Also, keep a copy of your calculations and your program/proce-
                           dures in the file for future reference.
                       2. Attach to the cement job report copies of charts, etc., made during
                           the job.

                           Keep the samples safe until the next cement job, or send to a local
                       laboratory, if requested.