Page 533 - Practical Well Planning and Drilling Manual
P. 533

[      ]
                                                                             Index


                     drilling program, 127–128      coagulation, 468
                     field quality control procedures for, 403–405  cohesion, 468
                       during job actions, 404–405  collapse, 99, 100, 101, 102, 104, 105
                       post job actions, 405           hole orientation, 298–299
                       pre-job actions, 403–404        loads, 72–73
                     mud conditioning, for maximum displacement,   calculation of, 71–72
                        399                            resistance, 73
                     post-job evaluation, 402–403      safety factors and, 61
                     preparation, 399–400              steel temperature correction factors and, 64
                     program, 257–280               colloid, 468
                       chemical spacers, 263–264    combined buildup, directional design and, 110–114
                       chemical washes, 263–264     combining weight, 475
                       good cement job factors, 264–267  compact surface wellhead, 96
                       references for, 280          compatibility
                       slurry properties, 258–263      of brine system, 31
                       solids removal, 266–267         casing connections and, 90
                     slurry mixing options, 399     compensated density neutron tool, 468
                     special purpose, cementing design, 278–280  compensated dual resistivity tool, 468
                     stinger, 402                   compensated neutron log, 468
                     well, 257                      completion, 21–36
                  central data summary tool, 183       brines and, 30–33
                  centralization, 91–92                component checking for, 34–35
                  centralizers                         drilling program and, 129
                     placement, 92–94                  dual/triple completion strings and, 34
                     spring/rigid, 466                 fluids, 29–30
                  centrifuges, 466                       characteristics, 23
                     decanting, solids control, 344–345  corrosion/biodegradable properties of, 30
                     value of, 15                      liner clearance and, 34
                  Charles's law, 466                   points to check on, 34–36
                  chemical(s), 466                     preparation for, 22–23
                     barrel, 466                       pressure testing, 24
                     spacers                           production and, 24
                       cementing program, 263–264      production casing clearance and, 34
                       good cement job factors, 266    recompletions and, 25
                     stock levels, mud on rig, 334     running, 23–24
                     washes                            stimulation, with gas lift, 24–25
                       cementing program, 263–264      well abandonment and, 25
                       good cement job factors, 266    workovers and, 25
                  choke line, 467                   completion tools, running, inside diameter for, 87
                  choke manifold, 467               component checking, for completion, 34–35
                  Christmas tree, 467               Composite Catalog, 369
                  chrome lignite, 467               compression, 99, 100
                  chronological sample taker, 467      loads, 81
                  circulating pressures, horizontal phase 1, 321  safety factors and, 62
                  circulation, 467                     steel temperature correction factors and, 64
                     lost, 359–364, 467, 485–486       strength, slurry properties, 260–261
                     rate, 467                      computer programs
                  clay, 467                            for casing design, 38
                     attapulgite, 462                  decision making with, xv
                     dispersion of, 204, 205–206    conductivity, 468
                     flocculation of, 205–206       conductor, 54–55
                     formations                        casing design criteria, 99
                       drilling, 204                   cement job objectives for, 268
                       mixed layer, 204                drilled/cemented, 127
                     organophilic, 241–242             drilling criteria, 99
                     platelet dispersion, 205          drilling program, 126
                     to water reaction, 204–205        driven, 126–127
                  clearance, casing connections and, 91  pipe, casing design and, 38–39
                                                  509






          INDEX.indd   509                                                        7/15/08   3:37:02 PM
   528   529   530   531   532   533   534   535   536   537   538