Page 534 - Practical Well Planning and Drilling Manual
P. 534

[      ]
                   Index


                     placement                      critical velocity, 500
                       casings, 381–385             crown, 470
                       drilling/cementing for, 383  crude oil, invert emulsion mud and, 233
                       driving the conductor in, 383–385  crystallization point, 470
                       jetting in the conductor and, 382–383  brine, 32
                       offshore, 381–382            curing total losses, with cement, lost circulation and,
                     setting depth, for flowline returns taking, 457  362–364
                  cone capacities, hydrocyclones, 343  cutting, 470
                  cone of uncertainty, 108             beds, stuck pipe, 303, 351–353
                  connate water, 468                   sampling, mud logging, 291
                  consistency, 468                     structure/characteristics/location, IADC 8 point
                  contamination, 468–469                 grading scheme, 415–416
                  contingencies sheet, drilling program, 143  testing, mud logging, 292
                  continuous phase, 469             cycle time, 470
                     invert oil emulsion mud, 233–235  cyclic stress graph, 59
                  continuous pumping, good cement job factors, 266  cyclone, 470
                  contractors
                     lead, xvi                      D
                     operators to, xv–xvi
                  controlled aggregation, 469       D exponent, 470
                  conventional mud, 469             Dahab, 185
                  coring, 284–290, 469              Dalton's law of partial pressures, 470
                     full-hole, 284                 Darcy, 471
                     planning considerations, 285–288  dead man, 471
                       contingency planning, 287    deadline, 461, 471
                       core recovery/preservation/surface handling,   decanting centrifuges, solids control, 344–345
                         286                        decision making, computers and, xv
                       core transport/storage, 286–287  deep propagation, 471
                       costs, 288                   deflocculants, polymers as, 212
                       laboratory analysis, 287     deflocculation, 471
                       methods, 285–286             dehydration, 471
                       objectives/justification, 285  density, 471
                       safety/quality control, 287     of brine system, 31
                       timing, 287                     range, lowest OWR recommended by, 240
                       wellsite analysis/reporting, 286  slurry properties, 258–259
                     system considerations, 288–290  depth dependent costs, drilling program, 139
                       general type description, 288–289  details sheet, drilling program, 141–142
                       horizontal coring, 289       detection systems, well control, 315–317
                       inner barrel, 288            deviated wellbore
                       low-invasion coring, 289        bending forces in, axial loads from, 77–79
                       oriented coring, 290            weight in, tension from, 73–74
                       pressure coring, 289–290     deviation
                       rubber sleeve coring, 289       drilling program, 126
                       slim hole coring, 289           planning of, 108
                  correlated electromagnetic retrieval tool, 469  diesel oil
                  corrosion, 469                       bentonite plugs
                     pipe yield strengths and, 63        drilling problems, 379–380
                  corrosion/biodegradable properties, of completion   procedure, 379–380
                     fluids, 30                        invert emulsion mud and, 233–234
                  cost estimates                    differential pressure, 471
                     of brine system, 31               sticking, 15, 471–472
                     drilling program, 133–143         stuck pipe, 305–307
                  cost-effective well drilling, keys, xvii  avoidance, 355–357
                  covalent, 469                          cure, 357–358
                  crater, 470                       dipmeter tools, 169
                  created fractures, 470            dipole shear sonic imager (DSI), 190–192, 282,
                  crew preparation checklist, casing running proce-  472
                     dures, 391–392                 direct-indicating viscometer, 501
                                                  510






          INDEX.indd   510                                                        7/15/08   3:37:02 PM
   529   530   531   532   533   534   535   536   537   538   539