Page 539 - Practical Well Planning and Drilling Manual
P. 539
[ ]
Index
parameters, 9–11 inclined wellbore
plectrum, 10 hydraulic force in, 69–71
hole sizes, 41–43 lateral forces in, axial forces and, 71
selection, 42–43 inclinometer, 482
homogeneous, 480 individual casing points, 54–56
Hooke's Law, 57, 480 influx height
hopper, jet, 481 calculation, 438
horizontal coring, 289 with gas on bottom, calculation, 437
horizontal phase 1, circulating pressures, 321 influx volume, calculation, 438
horizontal wells information sources, 445–446
directional design of, 116–117 CD-ROM, 446
measurement while drilling tools in, 168–169 internet, 445–446
precautionary measures, 156 office/technical library, 446
well control in, 155–156 inhibitive KCl-glycol mud, 224
well planning in, 155–156 inhibitors, 482
horsepower (hp), 481 inner barrel, 288
hostile environment litho density tool, 481 inside diameter (ID), 23, 370
Hughes ATM05 (417X), 185 for running completion tools, 87
Hughes ATM11HG (437X), 185 in-situ field stresses, wellpath planning and, 109–110
Hughes ATM22GD (517X), 185 in-situ stresses, wellbore instability, 297
hydration, 481 insoluble solids, formation damage from, 227
hydraulic force interfacial tension, 482
in inclined wellbore, 69–71 intermediate casing
sideways, calculation of, 69–71 casing design and, 39–40, 101
hydraulic horsepower (HHP), 15, 187, 188, 411 drilling criteria, 101
hydraulics, 481 points, 56
drilling, 187–190 intermediate liner, points, 56
drilling parameters and, 411–412 internet information sources, 445–446
hydrocyclones invert oil-emulsion mud (IOIEM), 233, 482
balanced adjustment, 343 brine phase, 235–240
cone capacities, 343 components, 233–240
drilling fluid, 340–341 continuous phase, 233–235
mud cleaners and, 343 crude oil and, 233
problems, 343–344 diesel oil and, 233–234
solids-removal process, 342 emulsion, 238
types, 341–342 low-aromatic mineral oil and, 234
hydrogen ion concentration, 481 nonmineral oil and, 234–235
hydrometer, 481 oil phase, 233–235
hydrostatic head, 481 OWR, 238–239
hydrostatic pressure, 65 synthetic oil and, 234–235
calculation of, 67–69 ion, 482–483
iron scales, 231
I
IADC 8 point grading scheme, 415 J
bearings/seals condition, 416–417 J and K alloy, 89
bit codes for, 416 jar placement, stuck pipe, 306–307
cutting structure/characteristics/location, jet hopper, 481
415–416 jet perforating, 483
dull bit features, 417, 418–419 jetting, 483
gauge wear, 417 in the conductor, conductor placement and,
reason bit pulled, 417, 418 382–383
tooth wear, 415 directional, directional drilling and, 424–425
IADC Drilling Manual, 112, 156, 323 kicking off and, 174–175
IADC special feature code/description, 197–199 tool, section through, 277
IADC tricone bit classification, 195 junk
inclination-only surface readout sub, directional plan- fishing operations for, 369
ning and, 164 stuck pipe, 304, 355
515
INDEX.indd 515 7/15/08 3:37:03 PM

