Page 540 - Practical Well Planning and Drilling Manual
P. 540

[      ]
                   Index


                  K                                 lime lignosulfonate mud, 210
                  kelly, 483                        lime polymer mud, 217–218
                     cock, 318, 333                 lime-treated mud, 485
                     joint, 483                     liner(s), 23, 485
                  keyseat, 484                         accessories, casing and, 91–95
                     wiper, 480, 484                   cementing
                  keyseating                             design for, 267–274
                     prevention, directional drilling, 423–424  job objectives for, 270
                     stuck pipe, 302, 350              clearance, completion and, 34
                  Kharita, 185                         drilling program, 126
                  kick detection systems               hangers, 94–95
                     ballooning effect, 319         liquid fraction, formation damage from, 227–228
                     false kicks, 319               litho density log, 485
                     response training/drills, 317–318  lithology/porosity determination, electric logging/
                     well control, 315–317, 315–319    sampling, 283
                  kick prevention, well control, 313–315  live oil, 485
                  kick tolerance                    load, 57
                     assumptions, 435                  formula for, 75–76
                     calculation of, 435–439        log data, in drill bit selection, 190–192
                     levels, drilling below, 319–320  logging while drilling (LWD), 42, 117, 162, 485
                     method, 436–439                   directional planning, 167–168
                     volume, 439                    long spaced sonic (LSS), 282
                  kicking off, 173–177              longitudinal drillstring vibration, rotary speed, 410
                     adjacent well separation and, 173  losses in heavily fractured cavernous formations, lost
                     badgering and, 174–175            circulation and, 361
                     build and, 173–174             losses in normally pressured deeper formations, lost
                     in casing from a window, 176      circulation and, 361–362
                     in casing with a whipstock, 176–177  losses to surface or seabed outside conductor, lost
                     on cement plug, 175–176           circulation and, 359–360
                     with downhole motor, 175       lost circulation, 359–364, 467, 485–486
                     jetting and, 174–175              additives, 485–486
                  kickoff plugs                        curing total losses with cement and, 362–364
                     cementing design, 276–278         drilling problems, 359–364
                     plug stability and, 278             heavily fractured cavernous formations and,
                     setting depth temperature and, 276   309–310
                     slurry properties and, 277–278      shallow unconsolidated formations and,
                  kill line, 484                          308–309
                  knowledge box, 484                     top hole, 307–308
                  Koomey TR-5, 328                     losses in heavily fractured cavernous formations
                                                         and, 361
                  L                                    losses in normally pressured deeper formations
                                                         and, 361–362
                  L and N alloy, 89                    losses to surface or seabed outside conductor
                  laminar flow, 484                      and, 359–360
                  last crystal to dissolve (LCTD), 32  severe/total losses, in shallow unconsolidated
                  lateral forces                         formation, 360–361
                     axial forces and, in inclined wellbore, 71
                     calculation of, 70, 111        lost circulation material (LCM), 14, 148, 154, 188,
                  lead contractor, xvi                 189, 195, 360, 362, 411, 413, 485
                  lead impression block (LIB), 369  lost returns, 485–486
                  lead slurry pumping, good cement job factors, 266  low temperature cement, slurry properties, 263
                  lead tong, 484                    low-aromatic mineral oil, invert emulsion mud and,
                                                       234
                  leakoff test, 50                  Lower Abu Roash formation, 185
                     example, formation integrity test and, 443
                  ledges, stuck pipe, 303, 351      low-invasion coring, 289
                  light fluid column, abnormal pore pressure from, 45  low-solids mud, 486
                  lignosulfonates, 485
                  lime, 485
                                                  516






          INDEX.indd   516                                                        7/15/08   3:37:04 PM
   535   536   537   538   539   540   541   542   543   544   545