Page 7 - Practical Well Planning and Drilling Manual
P. 7

Front Matternew.qxd  1/24/05  11:43 AM  Page vii






                                                                                 [Contents]

                       2.4.  Drillbit Selection, Parameters, and Hydraulics    181
                             2.4.1.   Overview of the Structured Approach      181
                             2.4.2.   Evaluating Offset Well Drilling Data     183
                             2.4.3.   Drilling Hydraulics                      187
                             2.4.4.   Using Log Data to Aid in Bit Selection   190
                             2.4.5  Types of Drillbits                         192
                             2.4.6.   Defining Recommended Bits                194
                             2.4.7.   BHA Considerations Related to Bits       200
                             2.4.8.   Drilling Program: Bit Selection and      201
                                    Drilling Parameters
                             2.4.9.   References for Drillbit Selection        201
                       2.5.  Drilling Fluids Program                           203
                             2.5.1. Reaction of Clays to Water: General Principles  204
                             2.5.2.   Dispersion and Flocculation of Clays in Water  205
                             2.5.3.   Mud Types Available                      206
                             2.5.4.   Dispersed Water-Based Muds               206
                             2.5.5.   Nondispersed or Polymer Water-Based Muds  210
                             2.5.6.   Formation Damage with Water-Based Muds   226
                                    (and Cements)
                             2.5.7.   Oil Muds                                 232
                             2.5.8.   Components of Invert Oil Emulsion Muds   233
                             2.5.9.   Environmental aspects of Oil Muds        240
                             2.5.10. Oil Mud Additives                         240
                             2.5.11. Formation Damage with Oil Muds            244
                             2.5.12. Air, Foamed, and Aerated Systems          246
                             2.5.13. Tendering for Mud Services                248
                             2.5.14. References for Drilling Fluids Program    251
                       2.6 Casing Running Program                              253
                             2.6.1.   Normal Drilling Program Requirements     253
                                    for Running Casing
                             2.6.2.   Addressing Potential Casing Problems in   254
                                    the Drilling Program
                       2.7.  Cementing Program                                 257
                             2.7.1.   Slurry Properties                        258
                             2.7.2.   Chemical Washes and Spacers              263
                             2.7.3.   Factors for Ensuring a Good Cement Job   264
                             2.7.4.   Cementing Design for Casings and Liners  267
                             2.7.5.   Cementing Design for Cement Plugs        274
                                    and Squeezes
                             2.7.6.   Special Purpose Cementing                278
                             2.7.7.   References for Cementing Program Design  280


                                                     vii
   2   3   4   5   6   7   8   9   10   11   12