Page 9 - Practical Well Planning and Drilling Manual
P. 9

Front Matternew.qxd  1/24/05  11:43 AM  Page ix






                                                                                 [Contents]

                       3.4.  Casing                                            381
                             3.4.1.   Conductor Placement                      381
                             3.4.2.   Equipment Preparation for Casing         385
                             3.4.3.   Job Preparation for Casing               386
                             3.4.4.   Casing Running Procedures                388
                       3.5.  Cementing                                         397
                             3.5.1.   Mud Conditioning for Maximum Displacement 398
                             3.5.2.   Slurry Mixing Options                    398
                             3.5.3.   Preparation for Cementing                399
                             3.5.4.   Cement Displacement                      400
                             3.5.5.   Post-Job Evaluation                      402
                             3.5.6.   Field Cementing Quality Control Procedures  403
                       3.6.  Drillbits                                         407
                             3.6.1.   Alternative Bit Choices                  407
                             3.6.2.   Drilling Parameters                      409
                             3.6.3.   Mud Motors, Steerable Systems, and Turbines 413
                             3.6.4.   Monitoring Bit Progress while Drilling   413
                             3.6.5. When to Pull the Bit                       414
                             3.6.6. Post-Drilling Bit Analysis                 415
                       3.7.  Directional Drilling                              421
                             3.7.1.   Rotary Bottom Hole Assemblies—           421
                                    General Points
                             3.7.2.   Preventing Keyseating                    423
                             3.7.3.   Directional Jetting—Practical Considerations  424
                             3.7.4.   Single Shot Surveys—General Points       425
                             3.7.5.   Magnetic Single Shot Survey Tool         426
                             3.7.6.   Totco Single Shot Survey Tool            428
                             3.7.7.   Gyro Multishot Surveys                   428
                       3.8.  Writing the Final Well Report                     429
                             3.8.1.   Suggested Final Well Report Structure    430
                       Appendix 1: Calculating Kick Tolerances                 435
                       Appendix 2: Formation Integrity Test Recommended Procedure  441
                       Appendix 3: Information Sources                         445
                       Appendix 4: Drilling Equipment Lists by Operation       447

                       Appendix 5: Conductor Setting Depth for Taking Returns to   457
                                  the Flowline
                       Glossary                                                459

                       Index                                                   505



                                                      ix
   4   5   6   7   8   9   10   11   12   13   14