Page 137 - Renewable Energy Devices and System with Simulations in MATLAB and ANSYS
P. 137

124             Renewable Energy Devices and Systems with Simulations in MATLAB  and ANSYS ®
                                                                                ®







                            Load power  50,000.00  Time (s)   Grid power  50,000.00  0.00  Time (s)



                             101.00  100.00  Rload.V*Rload.l  99.00  0.00  0.00  –100.00  Vgrid.V*Vgrid.l
                                                         DCAC efficiency  50,000.00  Time (s)




                                          Vgrid  0          95.00  90.00  85.00  80.00  0.00
                                            +  110  –     100.00   WM_AC.P/WM_SA.P*100
                                            Rload  121 ohm
                                                 0
                            Total solar power  50,000.00  Time (s)   W  WM_AC  0  Peak SA efficiency  50,000.00  Time (s)




                               100.00  0.00  0.00  +      110.00  100.00  90.00  80.00  0.00 ANSYS Simplorer ®  example model of PV array systems incorporating a DC/AC power electronics converter operating connected to a

                                          vop  vom  0              ax (WM_SA.P)/max(SA.pmp)*
                                    WM_AC.P(W)
                                                  vmp  imp  pmp

                            Load voltage  50,000.00  Time (s)  vip  vim  SA Vmp vs V_act  50,000.00  Time (s)



                             111.00  110.00  109.00  0.00  WM_SA  13.50  12.50  8.00  0.00

                                    WM_AC.V(V)
                                          +  W                 Y1 (V)
                            Ambient temp (°C)  50,000.00  Time (s)  vp  vm  SA Imp vs I_act  50,000.00  Time (s)





                             41.46  25.00  9.29  0.00  v_vmp  v_imp  v_pmp  10.00  0.00  0.00

                                  amb_eq
                                               vt             Y1
                                          vi
                                            amb_eq  + E2  –  0
                            Irradiation (W/m 2 )  irrad_eq 1000.00  0.00  50,000.00  0.00  Time (s)   irrad_eq  E1  +  Irrad_Temp_behav  –  EQU  0  SA Pmp vs P_act  100.00  Y1  0.00  50,000.00  0.00  Time (s)   (b)  FIGURE 5.23 (Continued)   single-phase AC grid (b).
   132   133   134   135   136   137   138   139   140   141   142