Page 26 - Rotating Machinery Pratical Solutions to Unbalance and Misalignment
P. 26

Introduction to Vibrations

            (1  ×  rpm) will be important in determining both conditions of
            unbalance and misalignment. Two and three times operating
            speed should also be recorded. Note that a vibration analyzer with
            a filter is required to isolate these frequencies.
                 A filter out reading should always be recorded, to assure the
            filter in readings capture all the frequencies that sum to the filter
            out reading. In addition, the filter out reading is used to determine
            the severity of the vibration.
                 Prior to providing another example, the criticality of equip-
            ment needs to be discussed. There are certain pieces of equipment
            within a facility that demand more attention than others.
                 The amount of effort spent on any given piece of equipment
            will be directly dependent upon its criticality factor.  Although
            each facility will need to build criteria of their own, the following
            illustrates how to categorize equipment.



            IDENTIFYING CRITICAL EQUIPMENT

                 When surveying a facility to determine the extent of a predic-
            tive maintenance program to be implemented on an on-going
            basis, one important factor is determining the criticality of equip-
            ment. The prioritization of equipment will assure the proper focus
            on critical items and further assure that maintenance monies are
            wisely spent.
                 To  evaluate each piece of equipment within the facility, the
            following chart can be used. Assign a value to each category based
            on the specific requirements of the individual company. Add the
            points scored by each piece of equipment and list them in de-
            scending order. You have now established a criticality list.
                 It is important that some base line be established as a refer-
            ence point. That is, all equipment should be surveyed and their
            basic maintenance condition established. This provides the overall
            maintenance condition of the facility, and can assist in preparing
            a maintenance budget.
                 During the preliminary maintenance audit, mechanical and
            electrical condition is noted as well as performance data. As an
   21   22   23   24   25   26   27   28   29   30   31