Page 24 - Separation process engineering
P. 24
F
packing factor, Tables 10-3 and 10-4
F
degrees of freedom, Eq. (2-4)
F
charge to still pot (Chapter 9), moles or kg
F
mass of feed in batch extraction, kg
F
feed flow rate, kmol/h or lbmol/h or kg/h etc.
F D
diluent flow rate (Chapter 13), kg/h
F , FP
lv
, flow parameter
F m
material factor for cost, Table 11-2
F p
pressure factor for cost, Eqs. (11-5) and (11-6)
F q
quantity factor for cost, Eq. (11-7)
F ,F solv
s
flow rate solvent (Chapter 13), kg/h
F solid
solids flow rate in leaching, kg insoluble solid/h
F weir
weir modification factor, Eq. (10-26) and Figure 10-22
gap
gap from downcomer apron to tray, Eq. (10-28), ft
g
2
acceleration due to gravity, 32.2 ft/s , 9.81 m/s 2
g
c
2
conversion factor in English units, 32.2 ft·lbm/(lbf·s )
G
flow rate carrier gas, kmol/h or kg/h
G′
gas flux, lb/s ft 2