5 - PROJECT SCOPE MANAGEMENT
5.5.3.2 Change Requests
See Section 5.5.3.2 of the PMBOK Guide.
®
Change requests for software projects may be handled informally or, depending on the formality of the validation
process, may be documented and handled using a Perform Integrated Change Control process (see Section 4.5 of
®
the PMBOK Guide).
5.5.3.3 Work Performance Information
See Section 5.5.3.3 of the PMBOK Guide.
®
5.5.3.4 Project Documents Updates
®
See Section 5.5.3.4 of the PMBOK Guide.
5.6 Control Scope
According to Section 5.6 of the PMBOK Guide, Control Scope is the process of monitoring the status of the
®
project and product scope and managing changes to the scope baseline.
5.6.1 Control Scope: Inputs
The inputs for controlling scope in Section 5.6.1 of the PMBOK Guide are applicable to controlling the scope of
®
a software project, with the extensions indicated below.
5.6.1.1 Project Management Plan
See Section 5.6.1.1 of the PMBOK Guide.
®
5.6.1.2 Requirements Documentation
®
See Section 5.6.1.2 of the PMBOK Guide.
5.6.1.3 Requirements Traceability Matrix
®
See Section 5.6.1.3 of the PMBOK Guide.
5.6.1.4 Work Performance Data
See Section 5.6.1.4 of the PMBOK Guide.
®
82 ©2013 Project Management Institute. Software Extension to the PMBOK Guide Fifth Edition
®