5 - PROJECT SCOPE MANAGEMENT






                   5.4.3 Create WBS: Outputs


                      The outputs for creating a WBS in Section 5.4.3 of the PMBOK  Guide are equally applicable outputs from
                                                                             ®
                   creating an activity-oriented software WBS.


                   5.4.3.1 Scope Baseline

                      See Section 5.4.3.1 of the PMBOK  Guide.
                                                   ®
                                                                                                                          5
                   5.4.3.2 Project Documents Updates

                      See Section 5.4.3.2 of the PMBOK  Guide.
                                                   ®


                   5.5 Validate Scope


                      According to Section 5.5 of the PMBOK  Guide, Validate Scope covers formalizing acceptance of the completed
                                                       ®
                   project deliverables. In software engineering, a distinction is made between verification and validation. Verification
                   is concerned with determining, in an objective manner, that the deliverable software is correct, complete, and
                   consistent with respect to the product requirements, design constraints, and other product parameters. Validation
                   is concerned with determining, in an objective manner, that the deliverable software will satisfy the needs and
                   expectations of customers, users, and other stakeholders when installed in the operational environment. Colloquially,
                   verification answers the question “did we build the software correctly?” and validation answers the question, “did
                   we build the correct software?”



                   5.5.1 Validate Scope: Inputs

                      The inputs for validating scope in Sections 5.5.1.1 to 5.5.1.5 of the PMBOK  Guide are applicable for validating
                                                                                     ®
                   the scope of predictive life cycle software projects. An additional input, described in Section 5.5.1.6 of this Software
                   Extension, is concerned with inputs for validating the scope of adaptive software project life cycle projects.

                      The primary input for validating scope of a software project is working deliverable software: other deliverables
                   may include an acceptance test plan, user training materials, installation and operating instructions, and guidance
                   for maintainers. The intended users, operators, and maintainers use these inputs to validate the acceptability of the
                   software. These work products may be in printed form or accessible online.


                   5.5.1.1 Project Management Plan

                                                   ®
                      See Section 5.5.1.1 of the PMBOK  Guide.