Page 106 - Software and Systems Requirements Engineering in Practice
P. 106
S o f t w a r e & S y s t e m s R e q u i r e m e n t s E n g i n e e r i n g : I n P r a c t i c e
76
(1) System pump should run at all times boiler is energized. When heat is no longer required,
minutes before being turned off. electrical power to boiler should be disconnected and pump should run for 5–15 (2) When 3 way valve is utilized, a minimum position stop on 3 way valve or an open bypass should be utilized to insure Typical Heating Coil a small flow thr
Note: Return from Inlet to Boiler
Used on Parker Hot Water System Part Name Boiler Piping Schematic
For Direct Fired, Closed System Heating with 3 Way Valve
Dr. RPC Date 11/16/01 PARKER BOILER co. Scale None
Ch. 5930 BANDINI BLVD. Supercedes No. 3-29-96 FIGURE 4.1
Approved LOS ANGELES, CALIF. 90040 DWG. No. A201-INST3