Page 267 - Standard Handbook Petroleum Natural Gas Engineering VOLUME2
P. 267

236    Reservoir  Engineering


                   This equation can be obtained by substituting in Equation 5154 the following term:
                   Bj = Bo + (R, - Rs) Bi  B,=  B,;   and  G, = Np%.

                     A schematic representation  [19] of the possible changes in fluid distribution
                   is presented in Figure 5143. In order to not omit any of the significant reservoir
   262   263   264   265   266   267   268   269   270   271   272