Page 274 - TPM A Route to World-Class Performance
P. 274

248  Index


                 Objective testing, 182             Six loss assessment, 49, 129
                 Operability, 188                   Skill development, 15, 72
                 Operator asset care, 14, 67        SMED, 108-113
                 Organisational learning, 168       Soccer team analogy, 38, 39
                 Overall equipment effectiveness  (OEE), 4-  Speed losses, 88, 114, 115
                   6, 40, 41, 65, 79, 126           Sporadic losses, 11
                 OEE:                               Standardisation, 186
                   best of  best, 42, 43            Start-up losses, 89
                   door to door, 5, 6               Steering group, 160
                   floor to floor, 4, 5             Supervisor roles, 175
                   machine, 4                       Supply chain, 2, 3
                   myths and reality, 7
                    vorked examples, 82-85,127-129   Team recognition, 167
                 Overhead projector analogy, 53     Teamworking, 39
                                                    Timing plan, 161, 163
                 Partnership, 34                    Total productive manufacturing, 2, 5
                 People’s perceptions, 149-155      Totally productive operation, 1
                 Performance contract, 35           TPM:
                 Pillar champions, 11, 12,25, 75       analogies, 3540,53-61
                 Pilot project structure, 158, 162     administration, 2,  77, 193-211
                 Planned, preventative maintenance, 66   benefits, 17, 27, 28, 29
                 PM analysis, 50, 104                  for design, 2, 74,181-192
                 Problem prevention cycle, 50, 99, 122   facilitator, 39
                 Problem prevention, 50                implementation route, 45,46, 145
                 Problem solving, 66,  104, 107, 108, 140,   improvement plan (9 Step), 30,48, 78
                   142                                 infrastructure, 167
                                                       master plan, 171
                 Quality losses, 88                    milestones, 46, 174
                 Quality maintenance, 15, 76           pilot, 47
                 Quotable quotes, 29                   standards, 164
                                                       targets, 34
                 Refurbishment, 50, 93,95, 96, 130     vision, 23, 44, 148, 165, 174
                 Reliability Centred Maintenance (RCM),  Trade unions, 34
                   33                               Training plan, 141, 162
                 Resistance to change, 152, 153     Transformation losses, 172

                 Safety, 77, 178                    User-friendliness, 185
                 Scoping study, 147-158
                 Senior management workshop, 146    Value stream, 1, 4,  193
                 Set up and adjustment, 87,108-113   Visual management, 69,177
                 Shingo, Shigeo, 108
                 Six losses, 5, 40, 41, 65, 85, 89   World class TPM plants, 18
   269   270   271   272   273   274   275   276   277