Page 110 - TPM A Route to World-Class Performance
P. 110
CRITICAL ASSESSbIENT
O\ era11 equipment effectik-mess A, I' and Q
East. of use P, Q and R
1'1
h in tai n a hi1 i t J M, C and R
Em ironmentcil rish E, h.1 and R
Reliabilit!. A, I' and R
Re\ ising those components \vith a high impact on q~ialit!. is a good starting
point for quality maintenance activities. Providing the assessment is applied
consistentlj, it can also be used to establish basic maintenance strategies such
as condition based (P = 3+) or run to failure (C = 1, h4 = 1, A = 3). These cm
then be refined as asset care routines are introduced and iniproL ecl.
Step 5 Condition appraisal
The objective liere is to make LIS~ of the same critical assessment elements
m~l components in order to assess the condition of equipment and to identifj
the refurbislmient programme necessarj. to restore the equipment to maximum
efkcti\,eness.