Page 110 - TPM A Route to World-Class Performance
P. 110

CRITICAL ASSESSbIENT










































                        O\  era11 equipment effectik-mess   A, I'  and Q
                         East. of  use                    P,  Q and R
                          1'1
                         h  in tai n a hi1 i t J          M, C and R
                         Em ironmentcil rish              E,  h.1 and R
                        Reliabilit!.                      A, I'  and R
                    Re\ ising those components \vith a high impact on q~ialit!. is a good starting
                    point for quality maintenance activities. Providing the assessment is applied
                    consistentlj, it can also be used to establish basic maintenance strategies such
                    as condition based (P = 3+) or run to failure (C = 1, h4  = 1, A = 3). These cm
                    then be refined  as asset care routines are introduced and iniproL ecl.

                    Step 5 Condition appraisal
                    The objective liere is to make  LIS~ of  the same critical  assessment elements
                    m~l components in order to assess the condition of equipment and to identifj
                    the refurbislmient programme necessarj. to restore the equipment to maximum
                    efkcti\,eness.
   105   106   107   108   109   110   111   112   113   114   115