Page 136 - TPM A Route to World-Class Performance
P. 136
The TPM improvement plan 115
Table 5.8 Strategies for increasing speed
Determine present levels * Speed
Bottleneck processes
* Downtime, frequency of stoppages
* Conditions producing defects
Check differences between What are the specifications?
specification and present situation 0 Difference between standard speed
and present speed
Difference in speeds for different products
Investigate past problems e Has the speed ever been increased?
Types of problems
0
* Measures taken to deal with past problems
Trends in defect ratios
0
e Differences in similar equipment
Investigate processing theories and 9 Problems related to processing theories
principles and principles
* Machining conditions
* Processing conditions
* Theoretical values
Investigate mechanisms * Mechanisms
9 Rated output and load ratio
Investigate stress
* Revolving parts
Investigate specification of each part
0
Investigate present situation * Processing time per operation (cycle
diagram)
* Loss time (idling times)
Check precision of each part
0
0 Check usinE five senses