                 Some examples of benefits from TPM
                 Case A: chemical processing plant

                   0  By-product output constrained by capacity
                      5 per cent increase in OEE to 90 per cent
                      Worth €400 000 in increased contribution per annum
                 Case B: manufacturing machining cell TPM pilot project

                   0  OEE increased from 40 per cent to 72 per cent over six months
                      Best of  best OEE of  92 per cent
                   0  47 per cent reduction in set-up and changeover times
                   0  100 hours per month liberated via TPM improvements
                      Additional manufacturing potential worth €48 000 per year by bringing
                      subcontracted off-load work in-house

                 Case C: automotive manufacturer
                      15-year-old wheel balancer
                   0  Average OEE before TPM = 45 per cent
                   0  Cost of  refurbishment = €8000
                   0  Each 1 per cent improvement of  OEE = €694 per annum
                      OEE achieved after three months = 69 per cent
                   0  Worth €17 000 per annum

                 Case D: polymer-based material producer
                   0  Production line from raw material input to bulk reels
                   0  Reference period OEE = 77 per cent
                      Consistent achievement of  best of  best OEE = 82 per cent
                      Value of  achievement = €250 000 per annum in reduced costs
                   0  One-off cost of  improvements = €1000

                 Case E:  cement plant
                   0  Weigh feeder mechanism unreliability
                   0  Reference period OEE = 71 per cent
                   0  Best of  best OEE achievement = 82 per cent
                   0  Worth €35 000 in energy savings per annum
                   0  Other TPM pilot improvements saved €300 000 per annum, plus avoidance
                      of  capital expenditure of  €115 000
                 Case F:  offshore oil platform with declining reservoir
                 After two years of  using TPM principles:

                      October 1997 achieved longest production run without shutdown since
                      1994
                      Gas lift now at greater than 90 per cent efficiency compared to 40 per
                      cent in 1995 and 60 per cent in 1996