Page 121 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 121
102 Cha pte r T w o
Bldg. Floor Site Area Bldg. Floor Site Area
2
2
Building Area (ft ) (acres) Building Area (ft ) (acres)
A 33,000 0.4 W 19,000 0.6
B 87,400 1.6 X 6,000 0.3
C 6,000 0.3 Y 5,000 0.3
D 27,900 0.3 Z 4,300 0.2
E 66,000 1.2 AA 33,000 0.4
F 14,000 1.4 BB 87,400 1.6
G 12,900 0.2 CC 6,000 0.3
H 6,000 0.1 DD 27,900 0.3
I 14,000 0.2 EE Park 0.5
J 29,000 0.4 FF 14,000 1.4
K 17,000 0.3 GG 12,900 0.2
L 9,000 0.3 HH 6,000 0.1
M 24,000 0.6 II 14,000 0.2
N 28,700 0.3 JJ 29,000 0.4
O 6,700 0.2 KK 17,000 0.3
P 39,900 0.4 LL 9,000 0.3
Q 344,000 2.5 MM 24,000 0.6
R 91,300 1.9 NN 33,000 0.4
S 22,000 0.3 OO 66,000 1.2
T 33,000 0.5 PP Vacant 1.1
U 42,000 0.5 QQ 9,000 0.3
V 14,000 0.8 RR 24,000 0.6
TABLE 2.E.1 Development Density Data for Exercises
6. You are planning to build a textile factory. You plan to have 50 full-time workers and 20 half-
time workers on the day shift, 30 full-time workers and 2 half-time workers on the evening shift,
and 20 full-time workers on the night shift.
A: Determine the maximum shift FTE.
B: To get SS Credit 4.2, how many bicycles must you provide secure storage for and how
many showers must you provide?
C: If the proposed parking by local regulations is 75 spaces, how many of these spaces must
be designated for only carpool/vanpool to get SS Credit 4.4?
D: What might be done to obtain SS Credit 4.3?
7. You are planning to build a college hall. There are 55 offices for faculty and support staff, plus a
daytime maintenance crew of four employees. There are 10 classrooms. Six of the classrooms typically
have a maximum capacity of 30 per fire regulations, and four of the classrooms have a maximum