LEED 2009 gives 1 point for 55%,  2 points for 75%, and 3 points for 95%.  LEED 2.2 allows 1 point for 75% and  In LEED 2009, only use one side of existing  interior structural walls in the calculations.  Both sides were included in LEED 2.2. ∗ LEED 2009 includes the interior finishes  on exterior structural and party walls in   As in LEED 2.2







             Major Comments  •    2 points for 95%.  •    •    the calculations. ∗  •    third EP point for 95%. ∗  •    EP point for 15%. ∗








           EP Pts   2.2  −  na  −      −         1              1




           EP Pts   2009  na  −        −         1              1



           Pts  2.2  na  1     1       1         1       1      1     1



           Pts  2009  na  1–3          1         1–2            1–2





             Subcategory 2.2  MRp1: Storage and   Collection of   Recyclables  MRc1.1: Building Reuse,  Maintain 75% of Existing  Walls, Floors, and Roof  MRc1.2: Building Reuse,  Maintain 95% of Existing  Walls, Floors, and Roof  MRc1.3: Building Reuse  Maintain 50% of Interior  Nonstructural Elements  MRc2.1: Construction   Waste Management  Divert 50% from Dispos










             Subcategory 2009  MRp1: Storage and   Collection of   Recyclables  MRc1.1: Building   Reuse Maintain   Existing Walls,   Floors, and Roof  MRc1.2: Building   Reuse Maintain   Existing Interior Non-  structural Elements  MRc2: Construction   Waste Management   MRc3: Materials   Reuse