Page 260 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 260

Cost ($)
                      Product
                      Wood (%)
                      FSC-Certified
                      Materials
                      Renewable
                      % Rapidly
                      within 500 mi
                      Materials
                      % Raw
                      from Site)
                      Location (mi
                      Manufacturing
                         n.a. 100,000   n.a.  n.a.  100    95       65,000    n.a.  0      0     600    Factory letter    20,000   n.a.  n.a.  100    69    Contractor  310,000    n.a.   0    0   355 Manufacturer    65,000    n.a.   0  100   227 Brochure   10,000    n.a.  n.a.  100   26    Common   knowledge  190,000    n.a.    75     75    59    Cut sheet    95,000
                      Source
                      Content Info
                         n.a.    15  n.a.   0   0  0     0     0     0     0     0     100      0  100     0      0
                      Recycled %
                      Preconsumer
                          n.a.  0      n.a.    60  5     100  0     25       85    95    90  0       40  0     0     0    Materials and Resources Project B Tracking Summary (Continued)
                      Recycled %
                      Postconsumer
                 Company  Bagley Salvagers  Koty’s Brick  Barwick Rubble  Burns Metal  Kendrick  Concrete  Mogan Mulch  Wall and Wall Walls  Byrd Siding  LeCroy Roof  Whetstone Tile  Powell Ceilings  Tristan Supply  Bethany Carpet  Sipes Padding  Kimberly Floor  Tune Finishes



                 Product  Used brick ∗  New brick  Concrete fill ∗  Steel  Ready mix   concrete  Compost  Wheatboard  Metal siding  Metal roofing  Ceramic tile  Acoustic tile  WC partitions  Carpet  Carpet pad  Linoleum  Special finish   wood †  TABLE 5.E.2







                                                                                   231
   255   256   257   258   259   260   261   262   263   264   265