Page 428 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 428

388    Cha pte r  T e n
































             FIGURE 10.2.4  Roof stormwater leaders directed into a rain garden under construction at
             Bothell High School in Washington. (Photograph courtesy Coughlin Porter Lundeen taken
             September 2008.)
































             FIGURE 10.2.5  Self storage facility in Florence, OR, with pervious concrete hardscape.
             (Photograph courtesy Dan Clem of Evolution Paving taken February 2010.)
   423   424   425   426   427   428   429   430   431   432   433