Page 149 - Thermal Hydraulics Aspects of Liquid Metal Cooled Nuclear Reactors
P. 149
Construction of experimental liquid-metal facilities 121
T, Q Power (Q) Gas Flow
Δp
Unheated end Flow
Pressure retaining vessel (10 bar) z = 870 TCs Δp
Three measuring levels in the heated zone TCs (0.5 mm) in grooves in the rod cladding wall TC(0.25 mm) at subchannel
z =0 (LBE).
Hexagonal flow channel H =328mm Flow THEADES at
z = –824 P = 10.5mm installed section
test
Venturi Pin-fixer (19 rods) spacers
Entry length for Venturi bundle
g wire with
Flow
D = 8.2 mm d = 2.2 mm Flow 19-Rod 3.3.7
Fig.