Page 148 - Thermal Hydraulics Aspects of Liquid Metal Cooled Nuclear Reactors
P. 148
Construction of experimental liquid-metal facilities
(LBE).
THEADES
Hexagonal flow Δp Pressure retaining vessel (10 bar) channel T, Q Three measuring levels in Unheated end the heated zone z = 870 z =0 TCs (0.5 mm) in grooves in H =328mm Power (Q) the rod cladding wall Gas TCs Flow Flow Δp Flow TC(0.25 mm) at subchannel 121
at
z = –824 P = 10.5mm installed section
test
Venturi Pin-fixer (19 rods) spacers
Entry length for Venturi bundle
g wire with
Flow
D = 8.2 mm d = 2.2 mm Flow 19-Rod 3.3.7
Fig.