Page 148 - Thermal Hydraulics Aspects of Liquid Metal Cooled Nuclear Reactors
P. 148

Construction of experimental liquid-metal facilities
                                                                             (LBE).
                                                                             THEADES
               Hexagonal flow Δp  Pressure retaining  vessel (10 bar)  channel  T, Q  Three measuring levels in  Unheated end the heated zone  z = 870  z =0  TCs (0.5 mm) in grooves in H =328mm  Power (Q) the rod cladding wall  Gas  TCs  Flow  Flow  Δp  Flow TC(0.25 mm) at subchannel  121
                                                                             at

                z = –824                                                P = 10.5mm  installed  section



                                                                             test
                             Venturi  Pin-fixer (19 rods)                    spacers



                           Entry length for Venturi                          bundle
                g                                                            wire  with
                       Flow





                                      D = 8.2 mm  d = 2.2 mm            Flow  19-Rod  3.3.7


                                                                             Fig.
   143   144   145   146   147   148   149   150   151   152   153