108    Cha pte r  T h ree

               2.  Bypassing water flow.
              3.  Thoroughly cleaning existing pipe and removing all films,
                 loose materials, debris, and silt prior to the lining.
              4.  Inserting the lining head connected to the lining rig into the
                 pipe.
              5.  Supplying mortar to the machine through high-pressure
                 hoses and ensuring uniform application of lining from the
                 sprayer at a constant speed.
              6.  Troweling of the applied cement-mortar with either rotating
                 trowels or spatulas attached to the lining head.

          After the completion of the application, the lining is cured in a con-
          trolled environment to prevent rapid loss of moisture. Usually CCTV
          or another inspection method is used to inspect quality of installa-
          tion. Table 3.5 represents advantages and limitations for cement-
          mortar lining methods.
          3.16.2 Epoxy Linings
          Epoxy lining was first introduced in the United Kingdom in the
          late 1970s and introduced in the North America in the early 1990s.


      Advantages                Limitations
      1. Minimum service        1. Bends, valves, and fittings must be
        interruption compared      removed prior to lining.
        to other pipe renewal   2. Bypass is required.
        methods.
                                3. Curing time is dependent on curing of
      2. Protects deterioration    cement and may take a long time.
        of pipe against further   4. Dependent on the lining thickness, there
        corrosion.                 may be a slight reduction of pipe internal
      3. For worker-entry pipes,   diameter.
        reinforcement can be    5. Does not enhance structural integrity of
        used to provide structural   the pipe.
        support (shotcrete and   6. Cement-mortar lining may result in high
        gunite).
                                   pH water.
      4. Usually entry and exit
                                7. Usually plugs ¾ in. or less valves or
        pit is required, no major
                                   lateral connections.
        excavation is necessary.
                                8. Quality and durability of installation
      5. Usually flow capacity
                                   is dependent on the adhesion to the
        is improved due to
                                   internal surface of the existing pipe,
        smoothness of lining
                                   which in turn is dependent on the degree
        surface compared to the
                                   the existing pipe cleaned.
        original surface of the
        existing pipe.
     TABLE 3.5  Advantages and Limitations for Cement-Mortar Linings