Page 319 - Trenchless Technology Piping Installation and Inspection
P. 319
Defect Score
Action Required (points/ft) Ranking Emergency repair score not • Initiate urgent procedure applicable A. All televised pipelines are ranked on a priority point per ft basis according to the severity of their defects. The ranking list is further subdivided into The identification and ranking procedures are
Condition Description Emergency condition • Collapsed pipe/street • Dirt pipe (CPD) • Crown of pipe gone (CPC, CG) • Void in backfill around pipe • Full flow obstruction/blockage categories to identify and quantify the urgency of the corrective work needed. placed into Category E for immediate review by the P.
Category E Table Notes: B. C. TABLE 7.4
282