Page 498 - Trenchless Technology Piping Installation and Inspection
P. 498

448     Inde x

          lining tubes, 298             Maxi-HDD (Cont.):
          load calculations               drilling rig, 193
            pipe collapse conditions, 272–275,   drill-rod radius of curvature,
               273t                          192–193
            pulling load planning guide,   external coating, 199, 199f
               271–272                    inspection/construction monitoring,
            pulling load theoretical         201–203
               considerations, 267–271    installation loads, 197–198
          load influence coefficients, 72t  manuals/guides for, 227
          load transfer                   operating (service) loads, 198–199
            flexible pipes and, 130–131, 131f  operations, 188–191, 190f, 191f
            flexible vs. rigid pipes and, 123–124,   pilot borehole phase, 188–189, 190f
               123f, 126, 126f            pipe collapse and, 219
            pipe-soil interaction and, 126, 126f  pipe load calculations, 217–219,
            rigid pipes and, 129–130, 129f   217f
            TEB test and, 129, 129f       pipeline fabrication, 187f, 193
          localized repairs, 56t, 62, 62f  preream phase, 189, 190f
          locating/tracking, pipe         product pipe specifications,
            CPJ, 311                         196–199
            HAB, 335                      pull force and, 217–219, 217f, 219f
            HDD, 348                      pullback phase, 189, 191, 191f
          longitudinal flexure, 133–134,   purposes of using, 186, 186f
             134f, 135f                   site investigation requirements,
          longitudinal tensile failure, 139, 140f  186–188, 187f
          lubrication fluids              specifications/drawings, 199–200
            HAB and, 335                  subsurface survey, 187–188
            MT and, 320                   surface survey, 187
            pipe bursting and, 355      metallic pipes
            pipe jacking and, 311         ductile iron, 171–176, 178
            pipe ramming and, 339         overview of, 171
            PTMT and, 327, 328            steel, 176–182
            safe handling of, 381       microtunneling (MT). See also pilot-tube
          lump sum contracts, 200          microtunneling
          lumps, 302t                     advantages/limitations of, 38
                                          allowable forces in, 318
          machine operation, safe, 381    applications, 33t
          manhole connections, 257, 258f,  boring machine, 312, 315f
             259f, 260                    construction and, 320–323
          manuals/guides for HDD, 227     cutting heads, 312, 314, 316f
          manufacturing                   inspection guide, 324f
            AC, 148–149                   introduction to, 312–317
            concrete pipe, 141–142        jacking force calculation, 321,
            ductile iron pipe, 173–174       321f–322f, 323
            GRP, 168–169                  jacking shaft in, 312, 314f
            PE, 163–164, 164f             main components of, 22, 32t
            PVC, 155–156, 155f            measuring pipe deformation in,
            steel pipe, 177                  317, 317f
            VCP, 150                      overview of, 20, 22
          mapping of utilities, 389–390   pipe materials, 317–320
          Marston, Anson, 2, 126, 127     pipe requirements, 318–319
          Marston load, 2                 pipe transportation/storage, 319
          mastic filled tongue and groove joints,   pipe/soil type and, 35t
             145, 146t                    planning, 315–317
          material change, pipe, 286t     protective coatings and, 320
          Maxi-HDD                        quality assurance/control, 314–315,
            contractual considerations, 200–201  317
            depth of cover, 192           schematics of, 22f, 316f
            drilled path design, 191–193  sequence of construction in, 24f
            drilling fluids, 193–196, 195f, 196f  standards regarding, 23
   493   494   495   496   497   498   499   500   501   502   503