Page 502 - Trenchless Technology Piping Installation and Inspection
P. 502

452     Inde x

          potholing, 385                reinforced concrete pipe (RCP), 142
          power boring, 100t            remedial actions, 104t
          prechlorination, 252, 253f    renewal methods
          preliner options, CIPP, 291     application of, 7t
          preream phase, 189, 190f        coating/lining, 106–113
          pressure limited due to stress   defects/remedial actions in, 104t
             calculation, 80, 83          disinfection methods, 101–102
          pressure pipelines              installation considerations, 101
            CIPP and, 278, 279t           overview of water pipe, 93–95
            decision support systems for, 64–65,   pipe cleaning methods, 99, 99f, 100t
               65f                        pipe inspection and, 98–99
          prestressed concrete cylinder pipe   planning/site investigation for, 98
             (PCCP), 142–143              reconnecting appurtenances, 105
          previous point repairs, 285t    safety and, 103, 105f
          profile wall PVC pipes, 157–158, 157f  selecting water pipe, 96–97
          profile/trajectory (vertical plane),   steps/phases of, 97, 97f
             209, 209f                    surface restoration/site clearing,
          project classification for pipe bursting,   105–106
             240–241, 240t                as trenchless division, 8
          project startup, proper, 382    waste disposal and, 106
          protruding service connections, 286t  water pipe applications and, 95–96,
          PTMT. See pilot-tube microtunneling  96t
          pull force, HDD, 217–219, 217f, 219f,  replacement methods. See also design
             220–221, 224, 224t            considerations, replacement;
          pullback assist, 28              existing pipe renewal/
          pullback phase, 189, 191, 191f   replacement
          pulled-in-place process, 290    allowable forces and, 351
          pulling loads, calculation of   application of, 7t
            borehole collapse and, 269–271, 270f  bursting, pipe, 229–233, 238–240,
            planning guide, 271–272          239f, 240f, 350, 353
            safe pull strength and, 269t  bursting vs. lining, 238
            steady-state movement, 267–269,   bursting vs. open-cut, 239–240, 240f
               268f, 269t                 construction considerations
            theoretical considerations, 267–271  regarding, 252–267, 354–355
          pulling shaft, 242–243          design considerations regarding,
          pull-off adhesion, 103t            241–251
          PVC. See polyvinyl chloride pipe  existing pipe materials and, 236–237
          PVC-M. See modified PVC         host pipe, 352–353
          PVC-O. See molecularly oriented PVC  inspection guide, 356f–357f
          PVC-U. See unplasticized PVC    introduction, 348, 350
                                          load calculations regarding, 267–275
          quality control/assurance       materials in, 350–354
            CIPP, 298                     new pipe materials and, 237–238
            HDD, 341–344                  overview of, 229
            MT, 314–315                   pipe dimensions in, 351–352
            replacement design considerations   pipe quality and, 354
               and, 249–250               pipe removal, 233–236
            spray-on coatings/linings, 102  pipes used in, 353
          quality levels, utility, 367–368, 367t  project classification and, 240–241,
                                             240t
          RCCP. See reinforced concrete cylinder   as trenchless division, 8
             pipe                       resins, 278, 283, 288
          RCP. See reinforced concrete pipe  restrained joints, 174, 175f
          reamer diameters, HDD, 20t    rigid pipes
          reamer safety, 343              AC, 148–149
          receiving shafts, 357–358       beam effect and, 136
          reconnecting appurtenances, 105  behavior of, 129–130, 129f
          reinforced concrete cylinder pipe   cement-based, 141–149
             (RCCP), 143                  concrete, 141–148
   497   498   499   500   501   502   503   504   505