Page 504 - Trenchless Technology Piping Installation and Inspection
P. 504

454     Inde x

          soiltight joints, 311         steel and ring joint, 146t
          soil-transportation system, PTMT, 326  steel pipe
          solid wall PVC pipes, 157–158, 157f  advantages/limitations of, 181, 182t
          Spangler, M. G., 2–3, 126       bar-wrapped steel-cylinder concrete,
          specifications, 248–249            143
          spiral welded pipe, 177         corrosion protection for, 177, 178
          spiral wound process (SWP), 58, 59f  corrugated, 176–177
          spray-on coatings/linings       history of, 176
            attributes of, 94–95          joints, 180–181, 180f, 181f
            cement-mortar, 106–108, 107f, 108f,  manufacturing, 177
               109t, 115t–116t            pipe jacking and, 308, 309
            defects/remedial actions and, 104t  standards, 179, 179t
            epoxy, 108–109, 110f, 110t, 115t–116t  steering assemblies, 185, 185f
            installation considerations, 101  stiffness, 123
            installation procedures, 114t  straight pipelines, 278, 279t
            installation steps/phases of, 97, 97f  strength, 123
            materials used in, 94, 94f  submittals, 249
            methods, 106–113            subsoil investigation steps, 369
            methods compared, 115t–116t  subsurface investigation
            moisture and, 95              HDD, 187–188
            objectives of, 93–94          locating existing utilities, 366–367
            ongoing research on, 116–117, 117f  planning for trenchless installation,
            overview of, 93–95, 94f          366–368
            pipe inspection and, 98–99    SUE and, 367–368, 367t
            planning/site investigation and, 98  subsurface utility engineering (SUE),
            polyurea, 109–111, 111f, 112f, 112t,  367–368, 367t
               115t–116t                SUE. See subsurface utility engineering
            polyurethane, 111–113, 113f, 113t,  sump pump, 385
               115t–116t                surface damage, pipe, 285t
            process schematic, 115f     surface survey, 187, 327, 365–366
            quality control, 102        SWP. See spiral wound process
            reconnecting appurtenances and,
               105                      tablet method, 101
            renewal method selection regarding,   tamping, concrete, 142
               96–97                    TBM. See tunnel boring machine
            safety and, 103, 105f       TEB. See three-edge-bearing load
            shotcrete as, 93            Tenbusch Insertion Method™, 236,
            structural classification of, 96, 96t  236f
            testing methods, 103t       TerraBrute™, 159t, 160
            waste disposal and, 106     testing issues, CIPP, 299
            water pipe applications of, 95–96,   thermoformed pipe (THP), 52f, 52t,
               96t                         54t, 56t, 60, 61f
          springline, 121f, 122t        thermoplastics
          staging, 377, 378f              overview of, 153
          standards                       viscoelastic material properties and,
            concrete pipe, 144, 144t         154–155, 154f
            ductile iron pipe, 174, 174t  thermoset resin system
            fiberglass pipe/ GRP, 169, 169t  description of, 278
            HDD pipe material, 344–345    types, 283, 288
            industry safety considerations and,   THP. See thermoformed pipe
               380                      three-edge-bearing (TEB) load, 2,
            MT, 23                         129, 129f
            PE, 165–166, 166t           thrust block, 385
            PVC, 158, 159t, 160–161     tolerance zone, 385–386, 386f
            VCP, 150, 151t              tool operation, safe, 381
          startup, proper project, 382  tracking. See locating/tracking, pipe
          static bursting systems, 232–233, 233f  training
          steady-state movement, 267–269,   equipment operator, 391–392
             268f, 269t                   safety, 381
   499   500   501   502   503   504   505