Page 71 - Urban Construction Project Management
P. 71

Local Specification  Industry  or Building  Pass/ Inspector’s  Date Standard  Code  Comments  Fail  Name Location Inspected  Section  Section  the rock   an











                                              Field Test Required Rock is rated as to its strength. Weathered rock typically has lower  while bedrock typically has   Recovery of from the sample tube will indicate its   which are sample building  are driven in various locations   Weights are then  brought in and applied to these piles. The piles are measured for any  settlement or movement to ensure that   supporting the   the pile hammer must  conform to the standards established. When special construction is required   to tempora










                                              Type of   strength,  high strength.  total cohesion.  Test piles,  piles,  throughout the site.  they are capable of  required loads.  Dropping of  existing structure,





                                                   Rock (strength   and recovery)  3. Foundation  Pile loads  Piling driving  criteria  Shoring and   underpinning












        44
   66   67   68   69   70   71   72   73   74   75   76