Page 76 - Urban Construction Project Management
P. 76
Comments
Pass/ Fail
Inspector’s Name
Location
Inspected
Date
Specification Industry or Standard Section
Local Building Code Section hay, the
the concrete mix to the added admixture has The intent is to sufficient This is achieved by spraying a wetting the concrete, the forms Shoring must be in
Field Test Required been placed according to the design mix approved by the consulting engineer. The aggregate is passed through a grated pans. make sure the aggregate is of graded sizes so that a good concrete These materials need to be analyzed for their salt content or any other minerals that may impact the concrete mix or rein- Concrete must be cured to ensure that the concrete retains its maximum or covering the concrete with burlap, Formwork must be examined to ensure that
Type of A sample is taken of determine if series of matrix is developed. forcing bars. strength. curing compound, or plastic. the concrete. to prevent collapse.
Admixtures Sieve analysis Sand and water Curing Shoring and formwork