Page 76 - Urban Construction Project Management
P. 76

Comments






                                           Pass/  Fail



                                           Inspector’s  Name






                                              Location





                                              Inspected

                                           Date


                                     Specification  Industry  or  Standard  Section









                                     Local  Building  Code  Section                                 hay,                   the



                                                  the concrete mix to the added admixture has  The intent is to  sufficient  This is achieved by spraying a  wetting the concrete,  the forms  Shoring must be in






                                              Field Test Required  been placed according to the design mix approved by the consulting engineer. The aggregate is passed through a  grated pans. make sure the aggregate is of graded sizes so that a good concrete These materials need to be analyzed for their salt content or any other minerals that may impact the concrete mix or rein- Concrete must be cured to ensure that the concrete retains its maximum  or covering the concrete with burlap,  Formwork must be examined to   ensure that











                                              Type of  A sample is taken of  determine if  series of  matrix is developed.  forcing bars.  strength.  curing compound,  or plastic.  the concrete.  to prevent collapse.







                                                  Admixtures  Sieve analysis  Sand and water  Curing      Shoring and  formwork