Some municipali- A there is a doubt as to the compressive core samples steel reinforcing or there are chairs in place to the concrete is ques- the concrete meets the mortar is
concrete is achieved. ties require the shoring to remain in place until 7 floors have been poured. professional engineer may have to sign on the shoring and formwork. off The base soil material supporting the shoring must be level and strong enough to accommodate the imposed load. If the concrete, strength of can be drilled through the slab and tested similar to cylinders. The area must be inspected to determine the proper amount of if wire mesh has been used and if adequate amounts of allow for proper concrete
Shoring foundation Core samples Pre-placement Concrete truck transfer time Full load test Mortar Exhibit 3-3 (Continued)