Some municipali-  A        there is a doubt as to the compressive  core samples  steel reinforcing or  there are  chairs in place to  the concrete is ques-  the concrete meets  the mortar is









            concrete is achieved. ties require the shoring to remain in place until 7 floors have been poured. professional engineer may have to sign on the shoring and formwork.  off The base soil material supporting  the shoring must be level and strong enough to accommodate the imposed  load.  If  the concrete, strength of can be drilled through the slab and tested similar to cylinders. The area must be inspected to determine  the proper amount of  if wire mesh has been used and if  adequate amounts of allow for proper concrete



















                           Shoring   foundation  Core samples  Pre-placement  Concrete truck   transfer time  Full load test  Mortar  Exhibit 3-3  (Continued)