Specification Industry or Standard Section
Local Building Code Section or the the
These welds can be ultrasonic testing, Welds must also be after the concrete was poured. The the fireproofing Check that all of
Field Test Required Welds must be tested to ensure that examined to ensure that they are of proper thickness as required. All welders must be certified for the material they will be welding. Torque gun devices must be calibrated Washers must be measured to ensure that they are properly Camber must be surveyed before and after the steel member is installed to ensure that the piece was made with the proper camber and that the camber was The concrete slab must be surveyed to ensure s
Type of there is no cracking. examined by x-ray, dye penetration. properly. compressed. “removed” is to be measured.
5. SteeI Welds Welders certification Bolt torque and compressive washers Camber Depth of concrete Spray-on fireproofing density, (depth, and adhesion)