Page 85 - Urban Construction Project Management
P. 85

smoke is removed from   a space within a designated time as   Electrical phases must be balanced to   the leg is Grounding must be tested to ensure that   it   current, escaping “free” Measure any voltage leakage that may  occur in wire and equipment insulation. Fire alarm and backup power must be tested to ensure that they are functioning and can be used in the event that they   test  A “pull the plug” can be done to simulate a power failure. All egress doors must be tested so that   all doors will open.  a fire,  ex














             Check to see if  determined by the fire department.  ensure that each phase of  equal.  in the event of  is sent to the ground.  become needed.  in the event of  Check to determine if being emitted in electrical panels,  or equipment.  fuses,  Check the operation of  to see if  console and if  location of











             Smoke purge   test   7. Electrical  Balance of  phases  Grounding  Hot potential test  Life safety   systems  Security system  Infrared test  Smoke detectors  Exhibit 3-3  (Continued)











                                                                                                                            51
   80   81   82   83   84   85   86   87   88   89   90