Page 86 - Urban Construction Project Management
P. 86
smoke is removed from a space within a designated time as Electrical phases must be balanced to the leg is Grounding must be tested to ensure that it current, escaping “free” Measure any voltage leakage that may occur in wire and equipment insulation. Fire alarm and backup power must be tested to ensure that they are functioning and can be used in the event that they test A “pull the plug” can be done to simulate a power failure. All egress doors must be tested so that all doors will open. a fire, ex
Check to see if determined by the fire department. ensure that each phase of equal. in the event of is sent to the ground. become needed. in the event of Check to determine if being emitted in electrical panels, or equipment. fuses, Check the operation of to see if console and if location of
Smoke purge test 7. Electrical Balance of phases Grounding Hot potential test Life safety systems Security system Infrared test Smoke detectors Exhibit 3-3 (Continued)